French Flamanville nuclear power plant explosion 2017

Construction began 1979

On 9th February 2017 in giro 9:30 local time a mechanical problem with a fan in the turbine hall.

 

Need dosimeter? Order here[email protected]

 

 

Compared to the previous MKS 05 Terra P model, the Terra-P+ model is far advanced.
It has a wider measurement range of ambient dose equivalent rate of gamma radiation and it can measure flux density of surface beta particles. It also can measure the ambient dose equivalent accumulation time. It allows automatic subtraction of gamma background while measuring the beta contamination.
It allows programming of the threshold values for gamma radiation ambient dose equivalent rate, surface beta flux density and ambient dose equivalent of gamma radiation.
It also features a digital display backlight and allows a wider operating temperature range.

 

 

explosion,nuclear power plant,Flamanville

Consulente per la ricerca scientifica

Interessato a sapere se i programmi clinici attuali, sviluppi della ricerca, o gli approcci terapeutici emergenti potrebbero essere rilevanti per la tua situazione?

Solo informazioni didattiche e di ricerca. Le decisioni mediche individuali dovrebbero essere prese consultandosi con operatori sanitari qualificati.

Whatsapp